UEA Slip rings: A Bridge Between Three Centuries

Submit to Digg digg it |  Add to delicious  delicious |  Submit to StumbleUpon StumbleUpon | Submit to Reddit reddit 

 As the many varied custom slip ring projects flow through the doors of United Equipment Accessories, occasionally one will seem to have a life and story of its own. Such was the case with the project involving the restoration and upgrade of the "Government Bridge" between Davenport, Iowa and the Rock Island Arsenal in Rock Island, Illinois.  This particular bridge sits atop the lock and dam #15, right between the gates.  It is what is commonly called a "swing bridge".  The bridge swings a full 360 degrees, allowing large boats and the tugs that push the numerous barges that travel up and down the Mississippi river channel to pass through.  The bridge structure carries auto and truck traffic on its lower level and two railroad lines on its upper level. The mechanism that allows this rotation is situated on the center pier between the locks, supporting the complete 366 ft section of the bridge on a series of rollers. Around the base of this structure a pair of very large roller chain "tracks" crawl their way around what looks like a giant sprocket which is part of the main base of the bridge. These tracks are driven through shafts, one on each side of the bridge, that extend up to the control house over 50 feet above. Inside the control house is a large electric motor and a series of gears to drive these shafts.

  This is the forth of a series of bridges at this location, which was the first railroad crossing the Mississippi river. The first bridge was built in 1856. It was burned two weeks after opening by the disgruntled river boat operators as they claimed it impeded navigation.  It is speculated that the competition that the railroad was going to present was a big part of the issue.  Abraham Lincoln defended the railroad in the court case that followed in 1857.  A second bridge was destroyed by a tornado in 1868. To see a more detailed history click here. Or go to http://www.riveraction.org/node/28.

  The present bridge was completed in 1896. Since that time, all the power for the motor as well as all controls and functions of the bridge was supplied by a wooden insulated slip ring that sat above the control house just below the high voltage lines that pass over the top of the entire bridge structure from shore to shore.  These power lines are supported on their own set of rollers that allow the bridge to rotate below them while still supporting them.  It was this space between these power line supports and the control house below that United Equipment Accessories was requested to create a custom slip ring to conduct the power and signals necessary for the day to day operation of this marvelous piece of engineering.  Due to the exterior nature of this location an enclosure for the slip ring would have to be completely weather proof for all of the extremes that this part of the country can deliver, from -30F to well over +120F when baked by the summer sun. Since United Equipment Accessories wanted to provide a solution that would last as long as the predecessor slip ring, with a minimum of maintenance, a stainless steel enclosure and supports was clearly called for. A special rope type seal was used on the 6" diameter main shaft coming in from above, as it would not be feasible to remove the enclosure or shaft for seal replacement.  This type of seal can be wound around the shaft for replacement when required.  It uses an adjustable gland to apply pressure, similar to the packing in a faucet stem.  Because of the number of circuits and the size of the cables a 6-8" bore range slip ring was required. This slip ring would be inverted in the enclosure, with the shaft coming in from the top and the core hanging down from it.  All circuits coming into the slip ring from the power lines above would pass through the inside of the shaft to the rings.  From there the brushes take the power from the slip ring and pass it to the cables that exit the bottom of the enclosure to the control house below.  Included in the slip ring with the power circuits are several communication circuits for all purposes from the railroad signals to telephones and video monitoring equipment which was added to the bridge during this major upgrade.  As part of the yearly winter shutdown the bridge goes through a full maintenance routine prior to reopening for the spring thaw.  United Equipment Accessories, as part of its dedication to customers, has agreed to provide an annual inspection during this shutdown to insure that this slip ring continues to provide the critical power and control needed to support the bustling river transportation industry.

slip ring

Above: Arial view of the bridge in operation as a boat steams into the lock.

slip rings uea slip ring

 Above: UEA Slip ring inside bridge

 


Wind turbine slip ring trip

Submit to Digg digg it |  Add to delicious  delicious |  Submit to StumbleUpon StumbleUpon | Submit to Reddit reddit 

Customer service at United Equipment Accessories is one way we set ourselves apart from our competitors.  I have been with the company for about 5 years now as a design engineer and I still am amazed by the effort that UEA puts forth to provide outstanding customer service. 

Just recently we had a wind turbine customer in Wyoming with a concern regarding the operation and maintenance of a slip ring.  After discussing the situation over the phone it was determined it would be beneficial to both the customer and UEA to meet face to face and examine the ring in operation.  Within 2 weeks myself and Kent Davis, another design engineer, visited the Wyoming wind farm.  What made this trip so challenging was the fact that the slip ring in operation is located 300ft above ground in the nacelle part of the wind turbine. 

In the past couple of years I have had the opportunity to climb 2 other wind turbines in the Midwest.    However, I came to conclusion that climbing a turbine in the Midwest was much different than climbing at 7000 feet above sea level in Wyoming.  It definitely took a little longer to get to the top, but we managed to make it and gather the information we came for.  It is very important to us to have our slip ring customers know we care about them enough to make the trip.

By UEA sending two engineers to address the customers' concerns, we were able gather information that will help us provide better products and services not just to this customer, but to all our customers.   This is just one example showing that UEA is dedicated to providing outstanding customer service no matter what the situation may be or how high we have to climb.  

Jesse Shearer

Design Engineer

 

A view from the TOP!!

slip ring for wind turbine